Skip To Main Content

Mulching and Landscaping - Borel

Project Status: Available


Project Overview

The landscape surrounding the Orchestra Chamber needs to be mulched to match the rest of the campus, as shown in Exhibit A. Mulching offers numerous benefits, including weed control, nutrient enrichment for the soil, and insulation for plants from heavy rain. The area should be covered with 3 inches of mulch to ensure these benefits are realized. Additionally, planting various greenery would help create a more vibrant and welcoming environment for students. Coordination with the Borel Principal is recommended to discuss specific details and preferences.

In addition to these improvements, the retaining walls around the Orchestra Chamber are deteriorating and will need to be replaced, as shown in Exhibit B. Addressing this issue will ensure the structural integrity of the area and provide a safer, more aesthetically pleasing environment.

Suggestion: Adjacent to this area, a previous Eagle Project involved creating a rainwater collection system that channels water from the gutter down a stone pathway, as shown in Exhibit C. Implementing a similar rainwater collection system here would add character to the landscape and assist with irrigating the new plants.

Current Landscape Photos

Project Information

Borel Middle School

425 Barneson Ave, San Mateo, CA 94402

Principal - Jessica Notte

jnotte@smfc.k12.ca.us

Dimensions

  • Unmulched area around Orchestra Chamber - Consult with Principal for Specifics

Materials

  • Landscaping tools and supplies

Safety Concerns

None

Desired Construction Time

Construction will need to be completed when students are off-campus, times such as after school hours, weekends, or school breaks are preferable for this activity.

Financial Aid

Depends if there are sufficient school funds for the year

Other Available Eagle Projects at Borel

Current Landscape Gallery